Energy terms, in plain words.

The words on an electricity bill, a solar proposal and a business case, in plain language. Each one says what it is and, where it isn't obvious, why it matters.

01 Glossary

On your bill

kWhkilowatt-hour
The amount of energy used: a 1 kW machine running for an hour uses 1 kWh.
Why it mattersMost of the energy charges on a bill are priced per kWh.
kWkilowatt
How fast energy is used at a moment: the power a machine draws while it runs.
kVAkilovolt-ampere
The total power the supply has to carry, useful or not. It's what the grid sizes your supply on.
Why it mattersDemand and capacity charges on most large-power tariffs are billed on kVA, not kW.
Power factor
kW divided by kVA: the share of the power drawn that does useful work. 1.0 is perfect; motors and drives pull it down.
Why it mattersBelow about 0.95, you pay demand charges on power that does no work. A capacitor bank fixes it.
kvar and kvarhreactive power and reactive energy
The part of the power that magnetises motors and transformers but does no work. kvarh is that over time.
Why it mattersSome tariffs charge for reactive energy beyond a free share.
NMDnotified maximum demand, or booked capacity
The supply capacity, in kVA, you've agreed with your supplier to reserve for your site.
Why it mattersYou pay for it every month whether you use it or not, and pay a penalty in a month you go over it.
Demand charge
A charge on the month's maximum demand: the highest kVA (or kW) in any half-hour of the month.
Why it mattersOne busy half-hour sets it for the whole month, so a steady load pays less per kWh.
Time of usepeak, standard and off-peak
A tariff that prices each kWh by when it's used: dearest in peak hours (weekday mornings and evenings), cheapest off-peak (nights and weekends), and dearest of all in winter.
Why it mattersMoving work out of peak hours saves money without using a kWh less.
Load factor
Average demand divided by maximum demand: how steady the load is. 1.0 would be the same load every half-hour.
Next:02Solar and batteries

02 Glossary

Solar and batteries

kWpkilowatt-peak
The size of a solar system: its output in full sun under standard test conditions.
Yieldspecific yield
How many kWh each kWp makes in a year. In South Africa, roughly 1,400 to 1,900 kWh per kWp, depending on the place, the tilt and the shading.
Used on siteself-consumption
The share of the solar energy the site uses as it's made.
Why it mattersOnly this share replaces energy you'd otherwise buy at full price; the rest is exported or lost.
Export
Solar energy sent back into the grid because the site couldn't use it at the time.
Why it mattersMany municipalities pay little for it, and some don't allow it at all.
Peak shaving
Using a battery, or moving work, to keep the month's highest demand down.
Next:03Buying power and contracts

03 Glossary

Buying power and contracts

PPApower purchase agreement
A contract to buy power from a system someone else owns, at an agreed price per kWh, for a set number of years. The system can be on your roof or far away.
Wheeling
Sending power from a solar or wind farm to your site over the grid you already use, for a fee to the grid's owner.
Take-or-pay
A contract term that makes you pay for an agreed amount of energy, whether you take it or not.
Why it mattersIt moves the risk of your own shutdowns and slow months to you.
SPVspecial purpose vehicle
A company set up to own one project: it raises the equity and the debt, builds the solar or wind farm, or the rooftop system, and sells the power.
Next:04The money

04 Glossary

The money

Payback
How many years the savings take to repay what the project cost.
Why it mattersQuick to grasp, but it ignores what happens after the payback year.
NPVnet present value
Every future saving and cost, turned into today's rand at a chosen discount rate, then added up. Above zero, the project earns more than that rate.
IRRinternal rate of return
The yearly return the project earns on its cost: the discount rate at which its NPV is zero.
Firm and indicative savings
Firm savings rest on measured data or a quote; indicative ones still rest on assumptions. They're shown apart and never added together.
Why it mattersA board can approve on firm savings; indicative ones need measuring first.
M&Vmeasurement and verification
Proving a saving after the work is done, by measuring against an agreed baseline (the energy use before, adjusted for production and weather).
Why it mattersIt's how a saving is shown to the board and a funder, and how it's certified for the section 12L tax allowance.
Next:05Contact

05 Contact

A word missing? Ask, and I'll add it.

Happy to explain a method, a number or how to use one of the free tools. Email is best.

Based in Johannesburg, South Africa.