Skip to content
Thabiso KaliEnergy engineer · CEM

For finance, commercial and investment people

Debt sizing by DSCR: sculpted vs annuity

Project lenders size senior debt from the cash flow, not the cost: each year's cash flow available for debt service (CFADS) must cover that year's interest and principal by a set margin, the debt service cover ratio (DSCR).

Inputs

Pre-filled with an illustrative case. Results update as you type. Jump to results

Cash flow available for debt service
R

EBITDA less tax and maintenance capex.

%

Tariff escalation net of cost growth and degradation.

Lender terms
x
%
years
%

Debt as a share of project cost.

R

Results

Sculpted repayment supports R9.9m (76% gearing); a level annuity R8.3m (64%).

Sculpted debt
R9.88m
76.0% gearing; DSCR binds
Annuity debt
R8.29m
63.8% gearing; DSCR binds
Extra from sculpting
R1.58m
Less equity needed
PV of CFADS
R12.84m
At 11.5% over 12 years

Cash flow and debt service

Rand a year. Sculpted debt service follows CFADS at the target cover; the annuity is flat, so the weakest year sets it. Hover for values.

  • CFADS
  • Sculpted
  • Annuity
R0R500kR1mR1.5mR2mR2.5m123456789101112CFADSSculptedAnnuityRepayment year

Sculpted against annuity

MeasureSculptedAnnuity
Maximum debtR9,875,477R8,291,531
Debt the DSCR alone allowsR9,875,477R8,291,531
Gearing76.0%63.8%
EquityR3,124,523R4,708,469
Minimum DSCR1.30x1.30x
Average DSCR1.30x1.63x
LLCR1.30x1.55x
Weighted average life8.6 years7.8 years
Total interestR9,773,654R7,400,777
Show both repayment schedules

Sculpted schedule

Rand. DSCR = CFADS ÷ (interest + principal). Scroll sideways on a phone.

YearCFADSOpeningInterestPrincipalDebt serviceClosingDSCR
11,700,0009,875,4771,135,680172,0121,307,6929,703,4641.30x
21,768,0009,703,4641,115,898244,1021,360,0009,459,3631.30x
31,838,7209,459,3631,087,827326,5731,414,4009,132,7891.30x
41,912,2699,132,7891,050,271420,7051,470,9768,712,0841.30x
51,988,7608,712,0841,001,890527,9251,529,8158,184,1591.30x
62,068,3108,184,159941,178649,8291,591,0087,534,3291.30x
72,151,0427,534,329866,448788,2001,654,6486,746,1291.30x
82,237,0846,746,129775,805945,0291,720,8345,801,1001.30x
92,326,5675,801,100667,1271,122,5411,789,6674,678,5591.30x
102,419,6304,678,559538,0341,323,2201,861,2543,355,3401.30x
112,516,4153,355,340385,8641,549,8401,935,7041,805,5001.30x
122,617,0721,805,500207,6321,805,5002,013,13201.30x

Annuity schedule

Rand. DSCR = CFADS ÷ (interest + principal). Scroll sideways on a phone.

YearCFADSOpeningInterestPrincipalDebt serviceClosingDSCR
11,700,0008,291,531953,526354,1661,307,6927,937,3651.30x
21,768,0007,937,365912,797394,8951,307,6927,542,4691.35x
31,838,7207,542,469867,384440,3081,307,6927,102,1611.41x
41,912,2697,102,161816,749490,9441,307,6926,611,2171.46x
51,988,7606,611,217760,290547,4021,307,6926,063,8151.52x
62,068,3106,063,815697,339610,3541,307,6925,453,4611.58x
72,151,0425,453,461627,148680,5441,307,6924,772,9171.64x
82,237,0844,772,917548,885758,8071,307,6924,014,1101.71x
92,326,5674,014,110461,623846,0701,307,6923,168,0411.78x
102,419,6303,168,041364,325943,3681,307,6922,224,6731.85x
112,516,4152,224,673255,8371,051,8551,307,6921,172,8181.92x
122,617,0721,172,818134,8741,172,8181,307,69202.00x

Method

CFADS in repayment year t
CFADS_t = CFADS_1 × (1 + g)^(t − 1), t = 1 … n
Sculpted repayment
DS_t = CFADS_t ÷ DSCR, D = Σ DS_t ÷ (1 + i)^t
Debt is the present value of the target debt service at the loan interest rate.
Annuity (level) repayment
A = min_t CFADS_t ÷ DSCR, D = A × (1 − (1 + i)^−n) ÷ i
Gearing cap
D_final = min(D, gearing_max × project cost)
Schedule
interest_t = opening_t × i, principal_t = DS_t − interest_t, closing_t = opening_t − principal_t
Cover ratios
DSCR_t = CFADS_t ÷ DS_t, LLCR = Σ CFADS_t ÷ (1 + i)^t ÷ D
For sculpted debt sized at the DSCR, LLCR equals the target DSCR.
Weighted average life
WAL = Σ t × principal_t ÷ D

Assumptions

  • Annual periods, payments in arrears, one fixed all-in interest rate (base rate, margin and fees combined).
  • Repayment starts in year 1 of operations; no grace period, construction interest or reserve accounts.
  • CFADS grows at a constant rate. In practice lenders size on a downside case (often P90 generation) and test the base case.
  • When the gearing cap binds, sculpted debt service is scaled down pro rata, so the DSCR rises evenly above the target.

Sources

More financial tools

All financial tools
  • Financial

    Business case: combine tool results into one project

    Add results from the technical tools as measures, then see the combined capex, saving, payback, NPV and IRR, the cost per kWh saved and a cost curve. Save the project as a file.

    You need
    Results added from the technical tools, or a project file
    You get
    Portfolio payback, NPV and IRR, cost per kWh saved, MACC, project file
    Open the tool
  • FinancialExcel model

    Solar PPA project-finance calculator

    A 1 MWp rooftop plant financed with senior debt: generation, PPA revenue, tax losses and the cash-flow waterfall, with returns, DSCR, LCOE and sensitivity.

    You need
    Plant size and yield, capex, opex, PPA tariff, debt terms, tax
    You get
    Project and equity IRR, DSCR, NPV, LCOE, payback, tornado
    Open the tool
  • FinancialExcel model

    Efficiency upgrade and section 12L calculator

    The after-tax business case for an efficiency investment, with and without the section 12L allowance: NPV, IRR, payback and sensitivity.

    You need
    Capex, kWh saved, tariff, maintenance, tax rate, 12L rate
    You get
    NPV and IRR with and without 12L, payback, tornado
    Open the tool