Skip to content
Thabiso KaliEnergy engineer · CEM

For finance, commercial and investment people

Levelised cost of energy (LCOE) calculator

The levelised cost of energy is the constant price per kWh that exactly recovers the capital and running costs over the life of a plant at your cost of capital. It is the fairest single number for comparing technologies and offers.

Inputs

Pre-filled with an illustrative case. Results update as you type. Jump to results

Plant
kW
%

Solar PV in South Africa: about 16% to 22%.

%
years
Costs (today's prices)
R
R/kW/yr
R/kWh
%
Discounting
%

Your cost of capital.

%

Results

Real LCOE R0.74/kWh, nominal R1.12/kWh, over 25 years at 12.0% nominal.

Real LCOE
R0.74/kWh
Today's rand; real rate 6.67%
Nominal LCOE
R1.12/kWh
Flat for the whole life
Capex share
85%
Of the present value of costs
Year-1 output
1,664MWh
39,207 MWh over life

NoteCompare like with like: the real LCOE (R0.74/kWh) is a price in today's money that rises with inflation; the nominal LCOE (R1.12/kWh) is a flat price for the whole life. A tariff that escalates should be compared with the real figure only if it escalates at inflation.

What makes up the real LCOE

R/kWh in today's money.

R0.00R0.20R0.40R0.60Capital: R0.63/kWhCapitalR0.63/kWhO&M: R0.11/kWhO&MR0.11/kWhTotal (real LCOE): R0.74/kWhTotal (real LCOE)R0.74/kWh

Present values

Costs are discounted at the nominal rate. Energy is discounted at the nominal rate for the nominal LCOE and at the real rate for the real LCOE.

MeasureValue
Capex (year 0)R12,000,000
PV of O&MR2,162,169
PV of all costsR14,162,169
PV of energy at the nominal rate12,624 MWh
PV of energy at the real rate19,143 MWh
Capital recovery factor (real)0.0832
Textbook check: (capex × CRF + fixed O&M) ÷ (8,760 × CF) + variableR0.71/kWh

The textbook formula equals the real LCOE when nothing degrades and O&M rises with inflation; otherwise the year-by-year figure above is the one to use. Annual O&M in year 1: R189k.

Method

Generation in year t
E_t = kW × 8,760 × CF × (1 − d)^(t − 1)
O&M in year t (today's prices escalated)
O&M_t = (kW × fixed + E_t × variable) × (1 + e)^t
Real discount rate (Fisher)
r = (1 + n) ÷ (1 + i) − 1
Present value of costs
PV(C) = capex + Σ O&M_t ÷ (1 + n)^t
Nominal LCOE
LCOE_nom = PV(C) ÷ Σ E_t ÷ (1 + n)^t
Real LCOE
LCOE_real = PV(C) ÷ Σ E_t ÷ (1 + r)^t
A price in today's money that, escalated at inflation each year, recovers the same present value.
Textbook cross-check
CRF = r (1 + r)^N ÷ ((1 + r)^N − 1) LCOE ≈ (capex × CRF + fixed O&M) ÷ (8,760 × CF) + variable O&M

Assumptions

  • Capex is spent at year 0 (no construction period); output and O&M arise at the end of each year.
  • O&M is entered at today's prices and escalated from year 0, so with escalation equal to inflation it is constant in real terms.
  • No tax, debt, residual value, inverter replacement or decommissioning cost.
  • The capacity factor is year-1 output divided by capacity × 8,760 hours; degradation reduces it each year after.

Sources

More financial tools

All financial tools
  • Financial

    Business case: combine tool results into one project

    Add results from the technical tools as measures, then see the combined capex, saving, payback, NPV and IRR, the cost per kWh saved and a cost curve. Save the project as a file.

    You need
    Results added from the technical tools, or a project file
    You get
    Portfolio payback, NPV and IRR, cost per kWh saved, MACC, project file
    Open the tool
  • FinancialExcel model

    Solar PPA project-finance calculator

    A 1 MWp rooftop plant financed with senior debt: generation, PPA revenue, tax losses and the cash-flow waterfall, with returns, DSCR, LCOE and sensitivity.

    You need
    Plant size and yield, capex, opex, PPA tariff, debt terms, tax
    You get
    Project and equity IRR, DSCR, NPV, LCOE, payback, tornado
    Open the tool
  • FinancialExcel model

    Efficiency upgrade and section 12L calculator

    The after-tax business case for an efficiency investment, with and without the section 12L allowance: NPV, IRR, payback and sensitivity.

    You need
    Capex, kWh saved, tariff, maintenance, tax rate, 12L rate
    You get
    NPV and IRR with and without 12L, payback, tornado
    Open the tool