Structuring a 1 MWp rooftop solar PPA (commercial scale)

A project company builds a rooftop plant and sells the power under a 20-year PPA. Does the tariff work for the offtaker, the lender and the sponsor at once?

Equity IRR
20.0%
Project IRR 15.6%
Minimum DSCR
1.27x
Average 1.52x
LCOE
R1.04/kWh
Tariff R1.15/kWh
Equity payback
Year 7
20-year PPA

Read it your way

Technical

For engineers, plant and facility managers

1,000 kWp at 1,650 kWh/kWp gives 1,650 MWh in year 1, degrading 0.5% a year. A 10% shortfall in yield takes minimum DSCR to 1.13x: the yield estimate is a credit question, not only an engineering one.

Go to the technical lens
Financial

For CFOs, investors, developers and lenders

Equity IRR 20.0% on 65% gearing, but minimum DSCR is 1.27x in year 1, near the edge of what lenders accept. Stretching the tenor to 12 years lifts it to 1.40x.

Go to the financial lens

The brief

Cheaper daytime power, with no capital from the building owner

A commercial building owner wants cheaper daytime electricity without spending capital. A project company (SPV) will build, own and operate a 1 MWp rooftop plant and sell its output to the building owner under a 20-year power purchase agreement. The tariff has to be low enough to save the offtaker money, high enough to cover a senior lender with room to spare, and still leave the sponsor an acceptable equity return.

Technical lens

Energy first: yield, degradation and what the roof can take

Energy, demand, yield, metering and savings: what the site or plant can actually do.

  1. 01
    Energy. 1,000 kWp × 1,650 kWh/kWp gives 1,650 MWh in year 1, degrading 0.5% a year.
  2. 02
    Operating costs. R180/kWp in year 1, escalating with CPI at 5%: one line for all operating costs.
  3. 03
    Self-consumption. Revenue assumes the offtaker takes every kWh. That holds only if the building's daytime load sits above the plant's output, which is the first thing to check against half-hourly meter data before anything is signed.

A yield shortfall is a credit event, not a rounding error. A 10% shortfall in specific yield cuts revenue exactly as a 10% tariff cut does, and takes minimum DSCR from 1.27x to 1.13x. The engineering estimate of kWh/kWp, its degradation and its availability is what the lender is really underwriting.

Generation, reference case

Year 1
1,650 MWh
Year 10
1,577 MWh
Year 20
1,500 MWh
Specific yield
1,650 kWh/kWp

Financial lens

Funding, tax and the waterfall

Returns, debt cover, tax and timing: what it is worth, and to whom.

  1. 01
    Revenue. PPA tariff R1.15/kWh in year 1, escalating 5.5% a year.
  2. 02
    Funding. Capex R12.00/Wp (R12.0m), 65% senior debt at 11.5% over 10 years (level annual payments in arrears) and 35% equity.
  3. 03
    Tax. 27% company tax. The full capex is deducted in year 1, as section 12B allows for solar PV not exceeding 1 MW (larger plants deduct 50/30/20 over three years). The assessed loss this creates is carried forward until it is used up.
  4. 04
    Waterfall. Cash flow available for debt service (CFADS) is EBITDA less tax. DSCR is CFADS divided by interest plus principal. Equity receives what is left.
  5. 05
    Returns. Project IRR on unlevered post-tax cash flow; equity IRR and NPV at 16% on levered cash flow; LCOE at 10% on capex and opex.

Key numbers, reference case

Project IRR
15.6%
Equity IRR
20.0%
Minimum DSCR
1.27x (year 1)
Average DSCR
1.52x
Equity NPV at 16%
R1.50m
LCOE
R1.04/kWh
Equity payback
Year 7

What the numbers say

The binding constraint is year 1. The year-1 deduction creates an assessed loss that shelters income until year 9, so early cash is untaxed, but revenue is at its lowest while debt service is flat. DSCR starts at 1.27x and climbs as the tariff escalates. Lenders commonly look for a minimum DSCR somewhere around 1.2x to 1.35x on contracted solar, so this case sits near the edge and the downside matters more than the base case.

Gearing at 11.5% against a 15.6% project return lifts the equity IRR to 20.0%. A 10% cut in tariff takes minimum DSCR to 1.13x, below most lenders' comfort. Stretching the tenor to 12 years spreads the same debt over more years and lifts minimum DSCR to 1.40x, with equity IRR at 20.9%.

Stress tests: one change at a time from the reference case
CaseEquity IRRMin DSCREquity NPV at 16%
Reference case20.0%1.27xR1.50m
Tariff 10% lower16.7%1.13xR277k
Yield 10% lower16.7%1.13xR277k
Capex 10% higher17.3%1.15xR545k
Interest +2 points18.6%1.17xR1.03m
Tenor 12 years20.9%1.40xR1.72m
Debt 55% of capex18.9%1.50xR1.24m

Commercial lens

Seven counterparties, one tariff

Contracts, tariffs and who carries which risk.

The year-1 tariff of R1.15/kWh sits about 10% above the R1.04/kWh LCOE. That is a thin margin for a 20-year contract, which is why the structure matters as much as the plant: who carries the yield risk, who pays if the roof needs work, and what happens to the PPA if the building changes hands.

Project company (SPV)Owns the plant and the contractsANNUAL CASH-FLOW WATERFALLRevenue Tariff × kWh1Operating costs O&M, insurance, rent2Tax 27% after losses3Senior debt service To the lender4Distributions to equity The residualCFADS = revenue − opex − taxDSCR = CFADS ÷ debt servicePower purchase agreementOfftakerBuilding ownerTariff payments (R/kWh)Roof leaseLandlordOwns the roof1Roof rentO&M agreementO&M contractorRuns and maintains1O&M feeInsurance policiesInsurerCovers asset risks1PremiumsClaims, if anyLoan agreementSenior lenderBank or debt fundDebt: 65% of capex3Interest + principalShareholders' agreementEquity sponsorInvests the equityEquity: 35% of capex4DividendsEPC contractEPC contractorDesigns and buildsContract price (year 0)Operating cash flow, every yearOne-off: funding, build, claims1Order of payment in the waterfall

Figure 1. Project-finance structure and cash-flow waterfall for a rooftop solar PPA.

The project company (SPV) owns the plant and signs every contract, so lenders look only to its cash flows. Solid arrows are annual operating cash; dashed arrows are one-off or contingent flows. Numbers give the order of payment.

Text description

  • Equity sponsor, shareholders' agreement: funds 35% of capex at financial close; receives dividends last (step 4).
  • Senior lender, loan agreement: funds 65% of capex; receives interest and principal each year (step 3) before equity.
  • EPC contractor, EPC contract: paid the contract price at year 0 to design, build and commission the plant.
  • Offtaker, power purchase agreement: buys the plant's output and pays the tariff per kWh, the SPV's only revenue.
  • O&M contractor, insurer and landlord: paid the O&M fee, premiums and roof rent as operating costs (step 1). Insurance claims, if any, flow back to the SPV.
  • Waterfall inside the SPV: revenue, then operating costs (1), tax (2), senior debt service (3), distributions to equity (4). Cash available for debt service (CFADS) is revenue less opex and tax; DSCR is CFADS divided by debt service.

Tools and downloads

Take it further

Contact

Working on something like this?

Energy-efficiency cases, tariff questions, solar and storage, or a model that needs checking before it goes to committee. Email is best.

Based in Johannesburg, South Africa.